Suppose you have a floor plan that includes mezzanine spaces. The depiction of these mezzanine spaces appears outside of the gross boundary. The end result is that CAD Integrator will not recognize these mezzanine spaces as a part of the same floor diagram, meaning any changes in the configuration of the mezzanine space cannot properly update the mezzanine space records, assuming they exist in TRIRIGA. Attaching the drawing as if it were a new floor plan results in those mezzanine spaces not having comparable space records created.
Has anyone else had a similar situation and come up with a solution such that the mezzanine spaces are treated in much the same way as the rest of the spaces on the floor plan?
Advertisements